Sale! View larger

AWWA ACE65368

New product

AWWA ACE65368 Cutting Your Costs and Losses in Water System Planning: Fort Ethan Allen Pump Station Upgrade

Conference Proceeding by American Water Works Association, 06/01/2007

Donahue, David J.

More details

$12.00

-50%

$24.00

More info

Full Description

This powerpoint presentation begins by providing background information on Arlington County, Virginia, and the Fort Ethan Allen Pump Station. Key project objectives included:Increase Transmission Capacity into ArlingtonCounty's Minor Hill Reservoir from theDalecarlia WTP;the Additional Capacity to Meet GrowthDemands through Buildout;provide additional Fire Flow Capacity toWilliamsburg Middle School, 5,000 gpd Design Flow; and,increase Water Transmission Capacity to MinorHill Reservoir from 9 MGD to Approximately 14MGD. Topics outlined include: original master plan alternative; original master plan water main improvements; hydraulic gradient with the original master plan alternative hydraulic gradient with the origin; existing pump and system curves; hydraulic modeling approach; key hydraulic findings of the original master plan alternative; key design challenges; alternative water system improvements; key elements of alternative; existing floor plan of Fort Ethan Allen Pumping Station; modified floor plan; interior photos prior to construction; new header wall penetration; and, exterior and interior construction photos. Includes figures.

Product Details

Edition: Vol. - No. Published: 06/01/2007 Number of Pages: 42File Size: 1 file , 8.8 MB