This paper presents the engineering considerations of controlling total sulfides (TS) at a groundwater facility in Orange County, Florida. A consideration of treatment techniques vis-a-vis cost and implementation feasibility is presented. The paper also provides preliminary information on applicable treatment methods for offgas from a forced draft aeration process for sulfide removal.
Product Details
Published: 01/01/1993 ISBN(s): 0898677149 Number of Pages: 21File Size: 1 file , 660 KB