More info
Full Description
This slide presentation outlines information on the Initial Distribution System Evaluation (IDSE) in relation to disinfection byproducts (DBPs) in the distribution system. Topics covered include: Stage 2 Disinfection Byproducts Rule (DBPR) and the IDSE; IDSE background; conducting and IDSE; IDSE waiver eligibility; IDSE options, Standard Monitoring Program (SMP) and System-Specific Study (SSS); minimum model requirements; Stage 2 DBPR compliance sites; IDSE reporting schedule; and, a case study of AwwaRF Project #2770, "Formation and Decay of DBPs in the Distribution System". Product Details
Edition: Vol. - No. Published: 09/01/2005 Number of Pages: 35File Size: 1 file , 1.1 MB